Wednesday, May 26, 2010
Congratualtions Brian Wiggins!
Results:
Championship Flight
Brian Wiggins 145
Levi Garcia 146
Jeremy Moreno 149
First Flight (Net)
Bob DeSoto 140
Doug Kerr 142
Second Flight (Net)
George Dodge 148
John LeJeal 148
George was declared the winner after a one hole playoff.
Thanks to all of the contestants for your participation!
Monday, May 17, 2010
San Luis Obispo Men's City Amateur
http://www.dairycreek.com/SLO%20County%20Mens%20Amateur.htm
Friday, April 23, 2010
BUSY, BUSY, BUSY!
As I said staff has been busy. At Dairy Creek, we are finally emptying out our storage areas that were full of pre-ordered fertilizers to help produce quality surfaces for the entire course. We applied a product called Polyon that will help feed our fairways, approaches, and immediate roughs with roughly a 1/10th of a pound of nitrogen through September. I have had great results with this product in other areas of the country and we are trying it here as well. This should help us reach our goal of consistency and save money at the same time since we will not have a need to fertilize again until our late fall fertilization. We will be making an application every 6 weeks or so on our tees boxes and green surround roughs. The GREAT thing about all of these fertlizers is that they are slow release fertilizers similar to the newer varieties that your local home and garden stores are beginning to carry. In the golf course industry we have been using these types of fertilizers for years because we want to save money (labor and material) and also because we want to be good stewards of the environment. If we apply products that do not last long and are not completely used up at the end and leave a long term residual we are wasting money and hurting the environment we intend to protect! It is my intent and that of my staffs to protect our water ways, water sources, and the fantastic wildlife that helps make our courses so inviting. I think you would find those sentiments coming from nearly every golf superintendent in the world! Aerification will take place the 4th of May.
Morro Bay just finished an aerification and we are nearly healed. We are in the process of repairing our aerifier so that we can fininsh aerifying the collars and move onto Dairy Creek at the beginning of May as stated above. We verticutt our fairways this spring instead of performing this task in June/July. Our intent was to get ahead of the Kikuyu grass and not to be in the way of the tourists and regular golfers during the peak of the season. We will be using a plant growth regulator this year to help control the thatchiness of this turf species as well in our effort to maintain efficiency. This thatch reduction will hopefully have the ancillary effect of reducing water inputs due to having to water enough to get through the thatch and into the soil where it will have a better result, not to mention that it will eliminate all of those whispy white seed heads that show up late in the day after mowing. We have expanded some of our habitat corridors to increase our wildlife populations. I understand that this may result in a few lost balls! For this I apologize, but we will continue to monitor these areas and make adjustments accordingly with the game of golf and you the golfer in mind. Again we want to exist in harmony with the environment and its inhabitants reaching the goals and missions of the Audubon program in which we are certified.
Chalk Mountain is in great shape as it usually is during the spring, fall, and winter. Not to say that the course is rough during the summer, but with the soils and water we are encountering on that course the summer presents more struggles. So from a turf managers standpoint we don't look bad, but staffs have to work much harder. Chalk is in the process of verticutting greens to remove excess leaf material and thatch in preparation for aerification. The irrigation upgrade has been helping to decrease water usage by improving coverage and efficiency and the course conditions are showing the results of these improvements. Since the renovation, irrigation programs have been tweaked and we will continue to tweak these systems in our attempt to provide consistency to all playing surfaces.
The rains this year have really hampered the amount of play that we have experienced at the three golf courses; however the water has flushed the soils and provided great playing conditions, so grab your bag and head to the course!
Sunday, March 14, 2010
Customer appreciation day
Wednesday, March 10, 2010
Golf Course Etiquette
I played golf yesterday at Morro Bay, as I occasionally do, to see how the courses are playing and to get feedback from our customers. I was happy with the conditions of the course as far as quality of cut and general aesthetics, although some people mentioned that some of the rough was a bit tall. I agree, but the mower can only cover so much ground in a day and we have had quite a bit of rain recently, so bear with us as we play catch up. The greens were exceptionally good in my opinion and the crews' hard work is paying off. We are using some new methods to control the Poa annua and it's seedheads including rolling 3x per week and topdressing occassionally. The greens have responded very well creating a smooth surface, a few bumps here and there (read on I will address this issue below), firming up quite a bit, and rolling about a 9.25-9.5 on the stimp meter. Yes that is right near 9.5! Now that is not too fast by the standards of the best golfers on flat greens, but on Morro Bay's greens it is nearly too fast. With all of the slope on the greens and the influence of Black Hill and the Pacific Ocean I guarantee it is nearly all that you want to handle and the greens will test the best of putting strokes. The players in my group were putting balls off of the greens and we had the occassional 5 putt. From my perspective that is dangerous as we loose pin positions and potentially increase golfers frustration.
Addressing the bumpiness of the greens...there are so many ball marks that are not being repaired and those that are repaired have not been fixed properly to the point that the repaired marks are dying or being scalped by mowers. It is part of a golfers responsibility to fix your ball mark and I like the adage of fixing at least one more. Yesterday I was fixing probably 20 marks per green and probably could have fixed 20 more, but we had to move to the next tee box. To speed the repair of the damage it is important to properly fix the ball mark. Many times people will use their divot tool and pry the soil up to fill in the depressed area. This does more damage than not fixing the mark at all. The reason is as you pry the turf up the lifting tears the leaves from the roots effectively killing the plant and ultimately leaving a dead brown spot on the green in a week or two. That brown spot will then take at least 2 weeks to heal and fill in on our Poa greens at Morro Bay and maybe longer on a bentgrass green. To properly fix the ball mark you should insert your repair tool into the turf at an angle toward the center of the ball mark. Instead of lifting the turf you should do the opposite and push the outsides of the mark to the center of the mark. Continue this process all of the way around the ball mark until the cinter of the mark has been filled in with good healthy turf. This procedure will allow the ball mark to heal within hours and maintain the true ball roll that we all desire. It is every golfers' responsibility to leave the golf course in better condition than you find it and it truly helps many of those putts around the hole find the bottom of the cup!